Switch Structure Information Worksheet

Use this form to provide LWS engineers information regarding your switch structure requirements. BE SURE TO FILL OUT ALL FIELDS. All this information is required to accurately specify the correct E-LAM pole to fit the corresponding switch that will be used.

Fields marked with an asterisk (*) are required.

Customer

Delivery Location

Specifications

(Ex: 6/25/2009 or Jun 25, 2009)
ft.
ft.
ft.
ft.
ft.
Guy Slope
Shield Wire (view “A–A,” below)

MDT = Maximum Design Tension
60°F = Tension at 60°F

Conductors (view “B–B,” above)

MDT = Maximum Design Tension
60°F = Tension at 60°F

Foundation Detail
Foundation Diameter

(PDF files only.)


©2008 Laminated Wood Systems Inc - All Rights Reserved