Expand All | Collapse All
Step 1
PRS Bottom Unit is driven into the soil OR placed in an augered hole and well tamped.
Step 2
PRS Upper Unit is placed over the bottom unit and rested on the ground.
Step 3
Bolting: Three pairs of cross bolts are connected to the specially tapered upper unit, structurally connecting the units to the pole.
Step 4
Banding: two high strength galvanized bands are placed near the bottom, eliminating drilling and exposing untreated wood at the ground line.